Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as "Traffic Signal Hardware and Wiring at Fair Oaks/Olive and Maude/Pastoria, TR-24-07" consisting of removing, salvaging, and discarding of existing traffic signal and electrical equipment, installing new traffic signal poles and foundation, traffic signal cabinets and foundation, service cabinets and foundation, traffic signal equipment, pull boxes, traffic signal conduit, conductors and cables, street lighting, hardwired and wireless communication; removing and discarding of existing curb, gutter, sidewalk, concrete, asphalt, excavated soil, and vegetation and installing new sidewalk, curb and gutter, ADA curb ramps, quick build curb extensions, reconstructing drainage inlet, installing slurry seal, and installing new signing and striping.