® Monthly robotic total stations surveys of the Wells Project concrete hydrocombine structure and the East and West Embankments. This includes field verifying the Monitoring Control Station (MCS) position. Field verify the hydrocombine, and embankment targets are clear and clean. Bi-annual verification of MCS points utilizing differential leveling and Global Positioning System (GPS). ® Annual conventional settlement/alignment sun/eys of embankments and concrete structure, lower west fish ladder road, debris boom, west end of West Embankment, west entrance, and north and south walls. o On-call services, which include but are not limited to: o Boundary & record surveys o Construction surveys o As-built surveys o Right-of-way surveys o Control surveys o Easement description & surveys