1 VE-SHE2303 / CNTY2301 414 W Franklin St. Shelton, WA 98584-3515 Todd Cannon 360-427-5501 toddc@masoncountywa.gov Install handoff in server room depicted on (CNTY2301 2025 Map.pdf) and per customer guidance. YES 150 100M 40,20,10 10 50 This is a multi-port / multi-VLAN request. 1. Vendor to deliver 1 port / 1 VLAN - one VLAN per port. 2. WaTech will assign VLAN numbers on Tech Order. 3. Vendor to clearly label their handoff device at the end site, with the WaTech provided site name. 4. Vendor to provide the VLAN to port assignment details with the completion notice. For example - VLAN A on port 1, VLAN B on port 2, etc. 5. Vendor to provide an aggregate circuit at the bandwidth specified in this RFQ. WaTech will police and shape the traffic for each VLAN. N/A 150 0.0 0 10 50 2 VE-SIL1801/ESD1804/DSHS5043 3120 NW Randall Way Silverdale, WA 98383-7676 ESD Contact: Eric Wojtach 360-706-3261 eric.wojtach@esd.wa.gov DSHS Contact: Liz Leona 360-789-9211 liz.leona@dshs.wa.gov Building Contact: Phil Stevens 360-391-2046 Install extended handoff no further than 10' from customers current dmarc and with direction from Contact. Advanced notice for all site visits must be set up with site contact prior to dispatch. I am working on getting a site map, but currently there isnt one. NO 150 100M 40,20,10 10 50 "Photos of equipment in corilation to current ESD equipment must be provided prior to circuit delivery acceptance. Set duplex setting to auto/auto. This is a multi-port / multi-VLAN request. 1. Vendor to deliver 2 ports / 2 VLANs - one VLAN per port. 2. WaTech will assign VLAN numbers on Tech Order. 3. Vendor to clearly label their handoff device at the end site, with the WaTech provided site name. 4. Vendor to provide the VLAN to port assignment details with the completion notice. For example - VLAN A on port 1, VLAN B on port 2, etc. 5. Vendor to provide an aggregate circuit at the bandwidth specified in this RFQ. WaTech will police and shape the traffic for each VLAN. Building owner prohibits equipment mounted above six feet from the ground on the building exterior. DSHS is not the sole tenant at this site. Demarc/NID/Ethernet switch to be located no further than 10 feet from the DSHS router in the same LAN room 120. DSHS requires vendor's installation drawing prior to work being done. Please make sure when new circuit is ordered, the vendor chosen is aware we want to be able to upgrade bandwidth to 1G auto with a software change. If a new switch needs to be installed to accommodate this please do this during new circuit installation. DSHS requires the use of existing pathways." N/A 150 0.0 0 10 50 3 VE-LCY3404 / ESD3410 / DSHS6148 670 Woodland Square Loop SE. 1st Floor Lacey, WA 98503-1090 ESD Contact: Eric Wojtach 360-706-3261 eric.wojtach@esd.wa.gov DSHS Contact: Liz Leona 360-789-9211 liz.leona@dshs.wa.gov Building Contact: Marv Fucal 564-200-3397 Install extended handoff into IT LAN room as depicted on site map (VE-LCY3404.pdf) no further than 10' from the customers IT equipment YES 150 200M 40,20,10 10 50 This is a multi-port / multi-VLAN request. 1. Vendor to deliver 1 port / 1 VLAN - one VLAN per port. 2. WaTech will assign VLAN numbers on Tech Order. 3. Vendor to clearly label their handoff device at the end site, with the WaTech provided site name. 4. Vendor to provide the VLAN to port assignment details with the completion notice. For example - VLAN A on port 1, VLAN B on port 2, etc. 5. Vendor to provide an aggregate circuit at the bandwidth specified in this RFQ. WaTech will police and shape the traffic for each VLAN. Pictures of the install in correlation to the customers equipment required for completion notice to be accepted. DSHS requires vendor's installation drawing prior to work being done. Customer is requesting installation of vendor equipment capable for future upgrade. DSHS requires the use of existing pathways. 150 0.0 0 10 50 4 DOCDPK1 Deer Park S.C.O.P.E. 316 E Crawford St. Deer Park, WA 99006-5338 Kimi Tuxford 509-244-4250 kktuxford@DOC1.WA.GOV Install extended handoff comm room which is the door behind he womens bathroom in the basement. Install per site contacts instruction and per attached site map (DOCDPK1 .pdf). DOC has its own wall mounted half rack for network equipment. YES 150 100M 40,20,10 10 50 Site is on the historical Register so only the current path can be used and there cannot be any roof mounting or new holes in the brick Walls. Advance notice of all site visits required, site requires vendor escort. N/A 150 0.0 0 10 50 5 DOCSPOY SCOPE NORTH 33 E Lincoln Rd, Suite #203 Spokane, WA 99208-5600 Building contact: Franz Griffin 509-413-3872 Site Contact: Kimi Tuxford 509-244-4250 kktuxford@DOC1.WA.GOV Site IT Contact: James Devaney 509-867-5901 jpdevaney@DOC1.WA.GOV Install extended handoff to IT TELCOM - Communications Closet/Electrical / Utility Rm. 2nd floor. Precise demarc location pending new site map. Consult site LCON for demarc and extended handoff instructions. NO 90 100M 40,20,10 10 50 Approval required by building contact for any Drillng Holes in the walls, running cables/conduit, any modifications to the facility. N/A 90 0.0 0 10 50