The work of this project includes, but is not limited to the following major items: a. Furnishing all labor materials, tools, equipment and incidentals necessary in suitable and adequate quantity as required to accomplish the work shown, specified herein, and as required to complete the project. b. CIPP lining of two manhole-to-manhole sections of the Patten’s Brook sewer in accordance with Specification Section 02607 attached. Section I is located on Friend Street between Ellis Court and Whitehall Road, and is approximately 170 feet long. Section II is located in between a manhole on Perkins Street and a drop manhole within a cross-country easement heading toward Sparhawk Street. Section II is also approximately 170 feet long. c. Reinstating lateral service connections as specified in Specification Section 02607 attached. d. Preparatory cleaning and CCTV inspection of sewers in accordance with Specification Section 02605 attached. e. Temporary bypass pumping of flows around the work in accordance with Specification Section 01510 attached. f. Traffic management and safety controls during work in city streets as specified below. . g. Miscellaneous work in easements and cleanup.