Area: EXTERIOR Div.# 2.R 3 Contractor Responsibilities: Obtain Work Permits from the City as Required, obtain overhead and underground utility locates before starting work. Grading and raking of all rough areas caused by equipment, and removal of all debris to off site disposal. Contractor must visit job site to familiarize himself with the existing conditions, difficulties and restrictions involved with doing this work. 2 Tree/Limbs/Remove. Remove Tree / Limbs. Tree #2- Trimming; Trim entire tree to leave a continuous contour uniform appearance, with no limbs hanging over the structure. Area: EXTERIOR Tree/Remove/37" to 48" diameter. Remove tree/37" to 48" diameter. Grind out tree stump,fill hole and re-grade area. Remove all debris away from the site at completion. Tree #1-Remove a large tree from the back yard. Removal shall be accomplished by cutting, then safely lowering to the ground, starting at the top and working downard to the ground. Remove all debris from the site at completion.