The project scope will include, but not be limited to, the following elements: • Loading Dock Replacement: Demolish and replace the existing loading dock with a new, expanded dock facility to accommodate large touring trucks and equipment. • Service Drive and Access Reconfiguration: Regrade and reconfigure the north service drive and parking areas to support WB-55 truck maneuvering, while maintaining safe east-west pedestrian circulation across the north side of Bromery. • Service Elevator Replacement: Replace the existing service elevator from the loading dock level to the stage level with a new elevator sized to accommodate the largest performance equipment. • Back-of-House Circulation Improvements: Increase vertical and horizontal clearances along the route from the loading dock to the stage, including raising floor slab elevations as necessary to provide continuous access. • Performer Support Spaces: Provide enlarged and improved back-of-house facilities, including dressing rooms, green rooms, rehearsal areas, and related performer amenities. • Displaced Program Replacement: Relocate or reconstruct existing spaces displaced by new additions, including the workshop and Music practice rooms. • Performance Systems Upgrades: Upgrade or replace lighting, rigging, and power distribution systems to meet current performance and touring show requirements. • Acoustic Enhancements: Implement targeted acoustic improvements in Tillis Hall based on recommendations from Rosati Acoustics + Multimedia to optimize performance, sound quality and audience experience.