A. Material Procurement (to be priced separately) 1. Supply one (1) new EVAPCO AT-19-214 or approved equivalent cooling tower. 2. Include all standard accessories and connections: Motors, fan assemblies, belts, shafts, bearings Fill media and drift eliminators Water distribution system and basin Access ladders, guards, and service platforms as required 3. Provide new ASC control panel (Model #CTP208V10P-3309, SERIAL #3309) for the cooling tower system, including temperature control, fan control, and integration with existing building systems. 4. Furnish new disconnect electrical boxes for all operating systems as required. 5. Include all valves, gauges, thermometers, and fittings necessary to connect to the existing pump system. 6. Supply new piping lines from the cooling tower to the existing system, including all insulation, supports, and pipe hangers.