The project consists of the regrading of the grass areas south of Taxiway F on both sides of Runway 17R-35L to meet FAA grading criteria. The relocation of existing electrical and telecommunication facilities is required to accomplish the grading revisions. The work includes demolition of existing aircraft rated PCC and asphalt pavement, installation of new duct banks (both direct buried and trenchless installation) and manholes to allow the relocation of existing LG&E, AT&T, FAA and UPS electrical and telecommunication cables, replacement of aircraft rated PCC and asphalt pavement, removal and replacement of existing in-pavement lights and conduit, along with associated demolition, earthwork, erosion control, and airfield marking.