The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment.