0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 2,196.270 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 14,414.000 _________._____ _________._____ 310 0030 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 97,839.000 _________._____ _________._____ ATTD 0040 315SP20-0048 ASPH. CONC. BMD P+VO SM9.5A TON 8,914.070 _________._____ _________._____ 315 0050 315SP20-0049 ASPH. CONC. BMD P+VO SM9.5D TON 3,626.990 _________._____ _________._____ 315 0060 512SD20-0027 FLAGGER SERVICE HR 1,085.000 _________._____ _________._____ 512 0070 512SD20-0043 ERADICATE NONLINEAR PVMT MRKG SF 800.000 _________._____ _________._____ 512 0080 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 129,200.000 _________._____ _________._____ 512 0090 512SP20-0002 MAINTENANCE OF TRAFFIC PLANT MIX LUMP SUM LUMP SUM _________._____ ATTD 0100 515SD20-0011 FLEX. PAVE. TIE-IN PLANING 0"-2" SY 5,976.960 _________._____ _________._____ 515 0110 515SD20-0013 FLEXIBLE PAVE.PLANING 0"- 2" SY 1,853.860 _________._____ _________._____ 515 0120 704SD20-0001 TYPE A PVMT LINE MRKG 4" LF 129,300.000 _________._____ _________._____