WIDENING, RUMBLE INSTALLATION & THERMOPLASTIC MARKINGS. 0001 0000100000-N 800 MOBILIZATION Lump Sum L.S. 0002 750 CY 1231000000-E 560 SHOULDER BORROW 0003 5.26 SMI 1245000000-E SP SHOULDER RECONSTRUCTION 0004 2,850 TON 1503000000-E 610 ASPHALT CONC INTERMEDIATE COURSE, TYPE I19.0C 0005 143 TON 1575000000-E 620 ASPHALT BINDER FOR PLANT MIX 0006 102,538 LF 1881000000-E SP GENERIC PAVING ITEM SINUSOIDAL MILLED RUMBLE STRIPS, CENTERLINE (14") 0007 205,075 LF 1881000000-E SP GENERIC PAVING ITEM SINUSOIDAL MILLED RUMBLE STRIPS, SHOULDER (8") 0008 3,250 SF 4413000000-E SP WORK ZONE ADVANCE/GENERAL WARNING SIGNING 0009 4457000000-N SP TEMPORARY TRAFFIC CONTROL Lump Sum L.S. 0010 543,579 LF 4688000000-E 1205 THERMOPLASTIC PAVEMENT MARKING LINES (6", 90 MILS) 0011 177,830 LF 4850000000-E 1205 REMOVAL OF PAVEMENT MARKING LINES (4")