1. White and Red Flexbase: 1-1/2” to 1-3/4” 2. Red Flexbase: 3/4" 3. White Flexbase: 3” to 6” 4. Red Gravel: native pitrun; native screened (2 “and less); commercial 5. 3/8” D Rock - Washed 6. ¼” D Rock - Washed 7. ½” D Rock – Washed 8. Grade 4 Rock - Washed 9. Crushed Concrete 10.Powder Cement 11.Each load must be accompanied by a sample. 12.Bids should include cost of materials at the plant site and should also include separately, the cost of materials delivered to each precinct’s barn. 13.Cost of materials should be priced per ton or per yard. 14.Location of each precinct are as follows: Precinct #1 is located at Pattonville, Texas, Precinct #2 is located at Roxton, Texas, Precinct #3 is located at Sumner, Texas, Precinct #4 is located at Faught, Texas. 10. The contract period will begin January 1, 2026 and end December 31, 2026.