The Project generally consists of the replacement of existing Unit Ventilators throughout as well as the replacement of the existing pneumatic controls with new controls (Trane Tracer)/thermostats at Jessie George Elementary School. This work includes, but is not limited to the following: 1. Removal and disposal of existing Unit Ventilators, piping, fin tube, etc. 2. Installation of new Unit Ventilators, lintels, steel, etc. 3. Modification of roof for new condensing unit(s) & exhaust fans. 4. Replacement of shelving along the exterior walls with new. 5. Mechanical, Plumbing, Electrical, Fire Alarm, and Data modifications, relocations and installation associated with new units. 6. Provide existing convectors with new control valves and wall mounted thermostats. 7. Alternates relating to new ceiling and lighting, additional controls + Main Office area HVAC upgrades. (See drawings and specifications for additional information) 8. All other associated work as shown on the drawings and specified herein.