The work at the Kirie Water Reclamation Plant (KWRP) is as follows: 1. Demolish switchgears M11 North, M11 South and their metal shack housing enclosure. Replace it with a new switchgear system with substation batteries, lighting transformers and other auxiliary equipment with various monitoring and control DCS I/O points. 2. Construct a new Pre-Engineered Metal Building (PEMB) to accommodate the new M11 switchgear, substation batteries, and other auxiliary equipment. New steel exterior materials and finishes will be selected to complement existing face brick masonry context and aesthetic of the Kirie Water Reclamation Plant (KWRP): a. The new building shall have two (2) rooms (Switchgear Room and Battery Room). b. The new building construction will be built over the existing vault. c. Provide new foundation for the PEMB. d. Provide two (2) new wall-mounted air conditioning units with heating capability, to operate independently of one another, to serve the Switchgear Room of the new building. Each unit will be provided with its own thermostat. e. Provide two (2) new wall-mounted air conditioning units with heating capability, to operate independently of one another, to serve the Battery Room of the new building. Each unit will be provided with its own thermostat. f. Install new lighting, required utilities, and required safety systems in new electrical building. g. Install new foundation drain system and building drain cleanouts. h. Construct concrete sidewalk and restore existing grading and landscaping to ensure proper rainfall drainage...