Pre-construction Video Recordings; Traffic Control & Protection; Trucking; Clearing; Televising of New Sewers; Tree Trimming, Removal & Replacement; Water Main Line Stops; HMA Pavement Restoration; Landscape Restoration; Fence Replacement; Concrete Roadway, Drives, Sidewalks, Detectable Warnings and Curb & Gutter Replacement; Temporary, Epoxy, Thermoplastic & Polyurea Pavement Marking; Pavement Marking Removal; Raised Reflective Pavement Markers & Removal; Temporary Concrete Barriers; Barrier Walls; Impact Attenuators; Licensed Plumbing Contractors; Directionally Drilling; Auger & Jacking of Steel Casing; Filling of Existing Water Mains; Detector Loop Replacement; Temporary Traffic Signal Installation & Timing; Traffic Signal Installation; Maintenance of Existing Traffic Signal Installation; Temporary Water Distribution System; Private Utility Locating and Material Testing of Materials for CCDD purposes.