A. Site Assessment 1. Conduct a full on-site inspection of all district parking lots (Upper Elementary, High School, and District Off ice as applicable). 2. Measure and document total square footage and existing surface condition. 3. Identify areas requiring milling, patching, and base repair. B. Milling and Repair 1. Mill existing asphalt surfaces where necessary to correct grade or remove failed sections. 2. Excavate and replace damaged subbase materials if needed. 3. Patch all areas of pavement failure using hot-mix asphalt. 4. Compact to appropriate density and ensure smooth transitions between milled and nonmilled areas. C. Sealing and Striping 1. Clean all surfaces prior to applying sealant. 2. Apply commercial-grade asphalt sealer in accordance with manufacturer specifications. 3. Fill cracks with hot-pour crack sealant as needed. 4. Restripe all parking spaces, crosswalks, fire lanes, and accessible parking areas per ADA and KDHE standards. D. Traff ic and Safety • Maintain safe and controlled access to all school facilities during construction. • Post appropriate signage and coordinate with district staff regarding access schedules. E. Inspection and Warranty • Conduct a final inspection with district representatives. • Provide a minimum 1-year warranty on workmanship and materials.