This project consists of the following elements of work: A. Pump Station 56 Abandonment: 1. Salvage equipment for Owner as identified on the Drawings and Specifications and as directed by the Engineer. 2. Remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances as identified on the Drawings and Specifications and as directed by the Engineer. 3. Remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. 4. Abate and properly dispose of regulated building materials containing lead and other regulated contaminants. 5. Abandon and fill the below-grade pump station structure. B. Installation of CIPP liner for existing 15-inch-diameter Sewer pipe located adjacent to the launch shaft as shown on the Drawings. C. Sewer System Improvements: 1. Furnish and install 8-inch-diameter no-dig ductile iron pipe PSS sewer main to line and grade by trenchless Guided Boring method as identified on the Drawings and Specifications and as directed by the Engineer. 2. Install new utility structures and connections to the existing sanitary sewer system and modify existing utility structures and re-channel bases.