CPS Energy is seeking a Company to inspect and complete reports on the overall conditions of the CPS Energy dams for an anticipated term of three (3) years. This includes but is not limited to the reading of piezometers and inclinometers installed within and adjacent to the embankments; visual observations of the embankments; drilling, sampling, and testing of the embankment and foundation soils as required; maintenance, repair, and/ or monitoring of existing instrumentation systems as required; and providing recommendations as required to keep dam structures in good working condition. This scope of work also includes providing geotechnical engineering consultation to CPS Energy during the development of plans, procurement, and construction phases of projects at all dam structures.