Removal and replacement of existing roof assemblies at Maximum to include, but not limited to, vapor barrier, 4” to 12” of insulation, wood fiberboard board, membranes down to concrete deck, curbs, flashing, and edge metal. Removal of (2) existing nonfunctioning rooftop units and infill concrete deck with existing adjacent materials, new roof to be flush with existing. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board and tapered insulation. Removal and replacement of existing roof assemblies at High Security, to include but not limited to 4 ply modified bitumen with gravel, ½” wood fiberboard, 3 ply built up roof, 3 ½ ± foam glass insulation down to concrete and tectum decking, standing seam metal roof, skylights, curbs, flashing, and edge metal at walls. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recover board, tapered insulation, standing seam metal roof, and skylights. Removal and replacement of existing roof assemblies at Minimum Security, to include, but not limited to, EPDM membrane, wet insulation (see report). RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board, and tapered insulation to replace wet areas. Removal and replacement of existing roof assemblies at Correctional Industries, to include but not limited to 3 ply modified bitumen, 2” to 3” insulation down to steel decking, curbs, flashing, and edge metal. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board, and insulation