1. Delivery: a) Coordinate delivery with the agency and each end user (see attachment B for contact information) b) Transport each unit to the designated residential address c) Ensure safe offloading and placement of the unit 2. Site Preparation: a) Conduct a pre-installation site assessment b) Confirm each site is level and accessible for delivery c) Perform minor leveling or adjustments if necessary 3. Installation: a) Position and secure the kennel unit at the designated location b) Ensure all doors, windows, and components are functional c) Install anchoring system appropriate for each site 4. Final Inspection: a) Conduct a walkthrough with each end user or agency representative b) Address any deficiencies or adjustments needed c) Obtain sign-off for each completed installation 5. Documentation: a) Provide warranty and maintenance documentation for each end user b) Submit a completion report to the agency summarizing each installation