Sitework Site preparation o Layout o Tree clearing o Stump removal o Sedimentation and erosion control including storm drains o Anti-tracking pad o Removal and proper disposal of all non-hazardous debris and organic material Earthwork, Excavation, Grading and Drainage o Formation of subgrade o Removal and disposal of any excess fill material o Provide excavation and backfill for building footings and foundation o Provide a compacted pad o Fine graded and ready for placement of concrete slabs o Excavation and backfill for piping, structures, storm water drainage system, sewage system, water system and utilities inside the building. See Division 15 Plumbing for 2 items not in the drawings but included in the scope of work. o Furnish and place granular sub-base for slabs, walks, and pavements o Dispose of excess earth materials and provide all suitable borrow materials o All rough and fine grading Utilities o Furnish and install complete water (domestic only, no fire) o Excavate and backfill for electrical, telephone and CATV conduit. All utilities for the buildings are to be brought to 5 feet inside of the building o Furnish and install electrical transformer pad Improvements o Storm drainage system o Pavement...