1.1 Contractor shall perform preventive maintenance on the lift equipment on the Equipment List under the Attachments Tab at the times that meet or exceed the manufacture’s recommendation, but not to exceed three (3) times per year per piece of equipment. 1.2 Contractor shall provide the Fleet Services Manager or designee a signed copy of the preventive maintenance services performed within 72 hours of service date. The form shall include the date of service, location, equipment type, manufacturer/model number, serial number, and City equipment number. 1.3 Contractor shall also perform repair services on equipment, upon written approval by Fleet Services Manager or designee, for items discovered during preventive maintenance services. 1.4 Contractor shall provide a not-to-exceed price for the repairs and include a detailed breakdown of the cost, including estimated hours or work, job classification, hourly rate, detailed equipment list, equipment costs, detailed material costs, delivery schedules, etc