Section 2: Scope of Work The awarded Contractor will be called upon to perform routine and emergency repairs to the Village’s sewer and water utility systems on an “as-needed” basis when the Village’s Public Works staff is unavailable to perform the work. The Contractor shall provide all necessary labor and equipment to complete the repairs as directed by the Village. The Village may require the Contractor to perform repairs during regular hours, after hours, weekends or on holidays. Over a one-year period (January 1st to December 31st), the Village estimates that it will request underground utility repair services a minimum of (4) times. Section 3: Reports on Delivered Services The Contractor shall complete and furnish a report (along with its invoice) for each repair it performs for the Village. The Contractor’s report shall include: • A description of the repair work performed • The date and time the Contractor was notified by the Village to undertake the repair • The date and time the Contractor arrived at the repair location • The date and time the Contractor completed the repair • The type of model of each piece of equipment the Contractor used for the repair • The positions of the Contractor’s employees who performed the repair