This Project includes the installation of a heavy slab foundation within existing floor and installation of the DN Solutions HM 1000 hard metals roughing machine. Contractor must certify it has (A) successfully managed the installation of a foundation with dimensions, load capacity, and structural complexity matching those required of the HM1000 in Oregon or Washington, and (B) successfully installed a precision machining center with machine size, accuracy, and operational specifications comparable to those of the HM1000 (see HM1000 Instruction Manual included as Attachment 5). The selected Contractor shall perform the following scope of services in accordance with the project drawings, specifications, and all applicable codes and standards: • Cut out and install a heavy slab within the existing floor footprint as shown in the construction drawings included as Attachments 2 and 3. • Provide and install plastic sheeting from the ceiling to the floor to create a dust containment barrier around the demolition/excavation site. • Remove and legally dispose of all demolition debris and excavation material in compliance with environmental and disposal regulations. • Execute all work in strict adherence to the notes and specifications provided in AKAAN Architecture and Design LLC Plans included as Attachment 1. • Allow a 30-day cure time for the heavy slab and demonstrate strength of the pour via cylinder testing prior to placing any machinery on the heavy slab. • Coordinate building access for concrete delivery vehicles to perform slab placement. Pumping methods may be utilized at the Contractor’s discretion, subject to coordination