The project scope consists of roofing replacement and repairs to the South Row Elementary School. The intent is to provide a sound roofing system that is leak free and weathertight. At project completion, Contractor shall provide a written guarantee that covers all defects in workmanship and materials for a period of two (2) years from date of acceptance, and a roofing system manufacturer’s twenty (20) year system warranty. General Bidders are to be DCAMM certified in Roofing (Prime). The Roofing Contractor shall be the General Contractor. The general scope of the construction work is as follows: Re-roofing of the existing flat roofing systems utilizing a “go-over” application. A new adhered PVC roof membrane system (80-mil minimum thickness) is specified and detailed complete with a manufacturer’s 30-year full system warranty. Work includes renovations and associated work to two (2) bathrooms as well as plumbing and electrical work. Relocations of the handicapped access ramp (new curb cuts). The existing handicapped parking spaces are to be relocated as part of the project