A. Execute patching to complement adjacent, undisturbed finishes. B. Fit products together to integrate with other Work. C. Execute work by methods to avoid damage to other Work, and which will provide appropriate surfaces to receive patching and finishing. D. Restore work with new products in accordance with requirements of Contract Documents. E. Fit work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. F. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with appropriate material to full thickness of the penetrated element as necessary to maintain the required rating. G. Where new work abuts or aligns with existing, perform a smooth and even transition. Patch work to match existing adjacent work in texture and appearance. Refinish surfaces to match adjacent finish. For continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit. H. Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible if identical materials are unavailable or cannot be used. Use materials whose installed performance will equal or surpass that of existing materials...