This work includes the provision oflabor, material, equipment, supervision and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs. In general, the scope of work in the Base Bid includes: 1. Standing Seam Metal Roof - Roof Areas A, B and C: a. Remove and dispose ofthe roof system including flashings and sheet metal down to the zee purlin framing. b. Provide vinyl faced batt insulation and thermal spacers over zee purlins. c. Provide standing seam metal roof panel system along with flashings, trim and accessories. d. Provide nonstructural wall panels and light transmitting panels to match existing at Area A to B and C to B elevation walls. e. Provide snow guard system along eave edge and upslope side of roof penetrations. f. Provide a complete, weathertight, 20-year warrantable roof assembly with 30-year finish warranty. 2. Office Area Mechancial System Modifications: a. Replace condensate pan under ai b. Provide overflow float switch to condensate pan. c. Provide condensate pump to condensate pan. d. Reinsulate approximately 6' of supply header insulation at air handling unit junction. e. Provide hard duct tap offthe retun ductwork, provide manual volume damper to control outside air. Adjust outside air value in accordance with equipment recomendations.