The work for CONTRACT NO. 89, WAVELAND AVENUE BULKHEAD REPLACEMENT, includes the furnishing of all labor, materials and equipment necessary to complete the work shown on the Drawings and as described in the Specifications. The work consists of the replacement of approximately 85 linear feet of bulkhead, construction of two stormwater inlets, installation of approximately 80 linear feet of stormwater culvert pipe, final roadway restoration via the HMA milling and resurfacing of approximately 460 square yards of roadway, installation of approximately 125 linear feet of beam guide rail, application of traffic markings, and the associated turf repairs on Waveland Avenue. The work is located within the Township of Galloway on Waveland Avenue between Fifth Avenue and Sixth Avenue.