This work will consist of installing two new separate single phase underground loops through two existing neighborhoods. The current primary cable feeds through the back yards of one development and in front of the other development, with many secondary cables going from the transformers in the back yards to the meter bases on the back of the townhomes. This full reconduct will be installing new primary and transformers on the roadside of the buildings and running 350 triplex behind the buildings to UV-4 pedestals and capturing the old services. All conductors are to be installed in conduit or pipe. Work will consist of installing approximately 3150’ of 1/0 underground primary, inside 2” conduit. There will be (11) new pad mount transformers (25kva-100kva) installed with concrete pads and grounding assemblies and (2) old transformers (25kva-75kva) that will stay in place with grounding assemblies added. There will be (26) primary terminations, inside the pad mount transformers. Approximately 950’ linear feet of 350 underground triplex will be run in 3” conduit, from the transformer locations to the (9) new UV-4 pedestals in the back yards. The UV-4 pedestals will be installed with grounding assemblies per Lawrenceville Power’s Specs. There are also (7) existing light poles in the development that will consist of running 360’ linear feet of # 6 duplex in 2” conduit to provide new feeds for these lights. Each of these lights will need a UV-2 hand hole box installed according to Lawrenceville Power’s Specifications. There will also be (3) Town and Country lights installed at 3 transformer locations, with (20’) direct bury poles. There will be (4) UM2 (Riser poles), one at each entrance that will need to be terminated, ran up the pole, and have u-guard installed to Lawrenceville Power’s spec.