• Provide one (1) new packaged unit equivalent to the existing unit currently installed at the library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. • Determine and install the required new circuit to the existing panel board. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. • Removal and disposal of the existing unit. • Provide any required piping, valves, and electrical installation, including new insulation and heat tracing for the outdoor CHW piping, if necessary. • Provide tie-in to the building’s existing BAS system costs to be included, if necessary. • Any crane rental and trucking costs shall be included. • Assume the use of the owner’s dumpster for the disposal of everyday construction trash. Any big items shall be hauled off by the vendor. • Respondent shall list warranty information and an approximate lead time on their bid submittal.