The scope includes, but is not limited to, the following tasks: 3.1 Pre-Installation • Conduct a detailed assessment of existing fire alarm panels and device types including locations. • Confirm compatibility requirements with the existing control panels and system architecture. • Coordinate project logistics with facility management and the authority having jurisdiction (AHJ) 3.2 Device Replacement • Removal of all existing: o Ionization smoke detectors o Devices operating under the Notifier CLIP protocol, including but not limited to: • Manual pull stations • Heat Detectors • Duct Smoke Detectors • Addressable Modules • Supply and installation of new, addressable and code-compliant fire alarm devices compatible with the current control panel and communication standards (e.g., FlashScan or equivalent). • Accurate labeling and documentation of all replaced and newly installed devices • Installation work shall conform to the 2019 edition NFPA 72 and all applicable State of Georgia codes. 3.3 System Integration and Testing • Update system programming to recognize and operate all newly installed devices. • Conduct comprehensive system testing, including initiation, annunciation and trouble signal verification. • Provide updated Workstation Files as needed 4. Deliverables • Fully installed and operational new addressable fire alarm devices. • Updated programming and device mapping for the system. • Final inspection documentation and system certification (if required) • Warranty documentation for new devices.