Replace Boiler #1 with a unit matching the larger capacity of Boiler #2 (PK Mach C-2000 (2,000,000 BTU)— estimated cost: $158,000. Boiler #1 will then serve as the primary boiler with the larger size being able to heat the entire facility. Boiler #2 will become the backup, and Boiler #3 will be removed. Removal of Existing Boilers: Safely disconnect and remove the existing boiler system. Properly dispose of the two old boilers and any associated materials in compliance with local regulations. Installation of New Boiler System: Furnish and install a new energy-efficient boiler system that meets or exceeds the heating capacity of the existing unit, which will remain operational. The preferred new unit should be a PK Mach C-2000, replacing the current PK Mach C-900LNX (900,000 BTU). Ensure the new system complies with all relevant safety and environmental regulations. Integrate the new boiler with the existing heating infrastructure of the facility. Incorporate new boiler into building management system graphics. System Testing and Commissioning: Perform comprehensive testing of the new boiler system to ensure proper functionality. Commission the system and provide certification of compliance with all applicable standards.