1. Provide cable as specified in Attachment A (CUP_4003847-Pkg_B-MV_Cable-Project Manual-IFB-2025-09-05.pdf), Project Manual for Lot C-1 Area Electrical Extension Package B Medium Voltage Cable Procurement Project: CUP 4003847 – Section 01 22 00 Part 3 – Execution. 2. Provide cable submittals as specified in Attachment A, Project Manual for Lot C-1 Area Electrical Extension Package B Medium Voltage Cable Procurement Project: CUP 4003847 – Section 26 05 13 Part 1.4 3. Provide preinstallation cable pulling calculations as specified in Attachment A, Project Manual for Lot C-1 Area Electrical Extension Package B Medium Voltage Cable Procurement Project: CUP 4003847 – Section 26 05 13 Part 3.1 4. The following specifications detail medium voltage cable for use on the 12,470V campus primary distribution system. The cable will be installed in concrete encased duct bank by others. The following specification covers the construction requirements of the cable to be furnished Cable to be delivered on wooden reels cut to lengths specified prior to ship date. It is anticipated that approximately 20 cuts will be required. Delivery will be accepted on or after June 1, 2026. Delivery of all materials must be received by Clemson University no later than 30 weeks from the issue of the purchase order to the contractor. 5. Contractor must adhere to delivery deadlines. Clemson University reserves the right to cancel the contract and/or impose penalties for missed deadlines.