Division 01 – General Requirements • - Mobilization/demobilization • - Temporary utilities (power, water, restrooms) • - Project management, supervision, and administration • - Safety compliance and site signage • - Submittals, shop drawings, and close-out documentation; Division 02 – Existing Conditions • - Selective demolition (walls, finishes, ceilings, MEP systems) • - Site clearing, removals, and hauling debris • - Hazardous materials identification and abatement (if required) • - Surface preparation for new construction; Division 03 – Concrete • - Concrete demolition/patching for new MEP penetrations • - Repair of existing slabs and foundations • - New concrete pads or housekeeping slabs for equipment • - Structural reinforcement if required by design; Division 04 – Masonry • - Repair and restoration of existing CMU, brick, or stone walls • - New masonry partitions as indicated • - Masonry infill of removed openings • - Mortar repointing and cleaning