The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. The Project is located at the East Wastewater Treatment Plant in Fernley, NV. he proposed improvements to Ponds 4A and 4B generally include dewatering, sludge drying, removal and disposal, removal of existing HDPE lining system, minor grading, subgrade preparation, and installation of new HDPE lining system for both ponds. Additional ancillary items including but not limited to life buoy stands, anchor trenches, pipe boots, ballast tubes, and escape ladders are also proposed.