The work to be done for this project shall consist of furnishing all labor, materials, and equipment necessary to construct the project titled Sgoda Road Service Area 200,000 Gallon Elevated Water Storage Tank – Division B as shown on the construction drawings. In general, the work consists of a 200,000- gallon elevated water storage tank with a height of 140.0' from the top of the concrete foundation to the tank overflow. Also included in work are yard piping, erosion control, grassing, grading, fencing, electrical, painting of tank and logo, and any additional appurtances necessary for a complete and operational tank and all other associated measures shown in the construction drawing and specifications for complete installation required for a complete project for the Twiggs County Board of Commissioners