Furnish allmaterials, labor, and equipment to resurface approximately 3.31 miles of Millpond Road, Linwood Lane, Clyde Griffin Road, Cindy Drive, Inman Lane and Marcia Lane, including traffic control and striping to Georgia DOT standards Road descriptions: Millpond Road, CR 24, .50 miles, paving width 20' Linwood Lane, CR 249, .19 miles, paving width 20' Clyde Griffin Road, CR 86, 1.65 miles, paving width 20' Cindy Drive, CR 271, .49 miles, paving width 20' Inman Lane, CR 230, .27 miles, paving width 18' Marcia Lane, CR 231, .21 miles, paving width 18' PROJECT SPECIFICATIONS 1. Traffic control It is the responsibility of the contractor to furnish and maintain all traffic control signs and devices in conformance to the manual on uniform traffic control devices (MUTCD) and to follow Section 150-Traffic Control (latest version as posted on the GDOT website) It is the responsibility of the contractor to install soft/low shoulder signs All signs to remain until grassing by county is acceptable 2. Contractor shall fill all dips in and along pavement edge 3. 4. 5. 6. 7. All intersecting roads shall be resurfaced 30' past edge @ 165 lbs. of asphalt All dirt roads shall be paved to the existing apron at 180 lbs. All driveways shall have a 2' lip paved and not to exceed 3' Note: Any special needs driveways will be discussed at the pre-bid Pavement marking 4" temporary striping required same day as resurfacing or milling 5" pavement marking after 30 calendar days of final paving operation Material and work and equipment