The scope of work for the project includes: 1. Construct new ADA ramps, drive approaches, valley gutters, and sidewalk panels at locations outlined in Exhibit “3G.” 2. New corners will be constructed to accommodate best pedestrian access routes (PAR). The corners will not be built to the existing road necessarily, considering the road can be reshaped during the mill & overlay process. 3. Onsite engineering will require consideration of drainage around the new ADA assets. If a drain is required, it should be packaged into the bid price. 4. Pricing includes the necessary transition panels to existing sidewalk, as well as curb & gutter transitions. 5. All curb & gutter is to be doweled into the gutter it is tying into. 6. All curb & gutter is to be poured against a clean, sawcut edge of asphalt, even if there is a grade difference between the two surfaces. If the asphalt is in poor condition, a field decision will be made whether to use a form board. 7. All new curbs shall be painted with “Ennis yellow.”