1 CONSTRUCTION ENGINEERING 1 LS 2 INSPECTION HOLE, DEEPER THAN 3 FT 4 EACH 3 MOBILIZATION AND DEMOBILIZATION 1 LS 4 CLEARING RIGHT-OF-WAY 1 LS 5 CHANNEL CLEARING 1 LS 6 PRESENT STRUCTURE, REMOVE, STRUCTURE NO. 1 1 LS 7 PIPE, REMOVE 66 LFT 8 EXCAVATION, COMMON 334 CYS 9 EXCAVATION, ROCK 40 CYS 10 BORROW 279 CYS 11 EXCAVATION, WATERWAY 129 CYS 12 STORMWATER MANAGEMENT BUDGET 13,100 DOL $ 13,100.00 1.00 $ 13 STORMWATER MANAGEMENT IMPLEMENTATION 1 LS 14 EXCAVATION, X 30 CYS 15 EXCAVATION, WET 183 CYS 16 EXCAVATION, FOUNDATION, UNCLASSIFIED 75 CYS 17 COFFERDAM 1 LS 18 SUBGRADE TREATMENT, TYPE IC 1,255 SYS 19 STRUCTURE BACKFILL, TYPE 1 28 CYS 20 STRUCTURE BACKFILL, TYPE 4 16 CYS 21 GEOTEXTILE FOR PAVEMENT, TYPE 2B 177 SYS 22 COMPACTED AGGREGATE, NO. 53 38 CYS 23 SUBBASE FOR PCCP 46 CYS 24 COMPACTED AGGREGATE, NO. 53 160 TON 25 WIDENING WITH HMA, TYPE B 42 TON 26 MILLING, TRANSITION 171 SYS 27 QC/QA-HMA, 3, 58S, SURFACE, 9.5 mm 107 TON 28 QC/QA-HMA, 3, 58S, INTERMEDIATE, 19.0 mm 202 TON 29 QC/QA-HMA, 3, 58S, BASE, 25.0 mm 518 TON 30 JOINT ADHESIVE 854 LFT