The work scope will involve the following features: • Renovation of men’s and women’s restrooms on the main level. • Renovation of men’s and women’s locker room facilities. • Removal and replacement of all plumbing fixtures, faucets, flush valves, hangers and supports, floor drains and related accessories. • Removal and replacement of all waste and vent piping including all underground sanitary waste and vent piping. • Removal and replacement of all domestic hot, cold and hot water return piping including water heaters and main service backflow preventer. • Provide trench drain covers for the existing drain troughs. • Preparation of flooring for new resinous flooring. • Preparation of walls in the restrooms and locker rooms for new paint. • Removal and replacement of existing ceilings in the restrooms and locker rooms. New ceilings in the locker room areas will be moisture resistant lay-in type. • Providing new ADA casework, shrouds and undermount lavatories for restrooms and locker rooms. • Construction of new block walls to separate shower stalls in the Men’s shower room. • Provide power for mechanical equipment and plumbing water heaters and associated equipment. • Demo existing light fixtures and reuse existing power circuits for new lighting fixtures in newly remodeled areas. • Demo existing receptacles and reuse existing power circuits for newly installed receptacles in newly remodeled areas. • Add new power for hand dryers as required. • Modify existing power panels as required for new mechanical/plumbing equipment. • Remove existing locker room/restroom energy recovery ventilator DX cooling coil, remote air-cooled condensing unit, refrigerant piping, condensate drain piping, electronic controls. • Provide new duct-mounted DX heat pump coil, refrigerant heat recovery dehumidification coil, refrigerant piping, condensate drain piping, remote air-cooled heat recovery heat pump, and direct digital controls for locker room/restroom HVAC.