1) Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. 2) Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. 3) Permitting of the work as required. 4) Coordination with Georgia Power for the installation of the new service entrance. 5) One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. 6) New medium voltage generator bus and new service entrance equipment housed in a new electrical building. 7) The site layout will be sized to accommodate two additional future generators, providing a 7500kW backup supply for the ultimate plant capacity per the facility master plan. 8) New electrical building will require new paved driveway access. 9) Commissioning and start-up of the new facilities. All correspondence must be made through the Vendor Portal.