The purpose of this project is to provide engineering support and design services for the rehabilitation and replacement of Sewer Pump Stations 19 and 21. Both wet-well/dry-well stations, originally constructed in 1966, have reached the end of their useful life. Work at each site will include removal and replacement of pumps, piping, mechanical systems, and associated electrical and control equipment; repair, rehabilitation, or replacement of concrete vault structures; and utility reconfiguration, modernization, and site improvements. While the design will be informed by existing documentation and specifications from previous pump station projects, consultants shall also consider each site’s unique characteristics and apply innovative design and construction solutions. The objective of the project is to extend the service life of each station by approximately 50 years while minimizing impacts to nearby residents and the shoreline environment.