1. Proposed Work: The Contractor shall finish all labor, materials, tools, and equipment necessary for the successful execution of the work of installing by directional bore approximately 550 feet of 2” Schedule 80 HDPE (High-Density Polyethylene) conduit in accordance with these specifications. Quantities to be verified by bidder. 2. Materials: 2” HDPE Schedule 80 (High-Density Polyethylene) conduit 3. Work to be Done: a) Install conduit as shown on attached sketch. b) Will consist of one bore from marked location at edge of pavement adjacent the office building to the brine making room. Install approximately 550’ of 2” Schedule 80 HDPE (High-Density Polyethylene) conduit. 4. Cleanup: Upon completion of the work all surfaces shall be left clean and free from defects. Any defective work shall be replaced or otherwise made good as directed by the SCDOT Project Manager, and without cost to the Owner.