PSEG Long Island, LLC (“PSEGLI”), on behalf of the Long Island Power Authority (“LIPA”), is issuing this 2025 Request for Proposals for ISO-NE Capacity (“2025 ISO-NE Capacity RFP”). As described in Section 1.3.1, LIPA is seeking to procure up to 345 MW of Capacity from one or more generating facilities located in the New England Control Area for the NYISO Capability Years 2027 – 2028, 2028 – 2029, 2029 – 2030, 2030 - 2031, and 2031 - 2032, which are eligible to qualify as Locational Installed Capacity for Long Island (Load Zone K) under the applicable NYISO Rules. This RFP is seeking the following: • Up to 345 MW of Installed Capacity (“Contract Capacity”) from the New England Control Area that will qualify as Long Island Locational Installed Capacity as outlined in the NYISO ICAP Manual for External Installed Capacity Suppliers