Preliminary Design. 5.1.1 Review zoning, topography, APFO and other development plan requirements for Development Site(s); 5.1.2 Advise the Commission on a desirable and feasible new construction development program for the site; 5.1.3 Participate in collaboration with third-party developer or development consultant and/or home builder selected by the Commission to determine the final site plan; 5.1.4 Prepare any requested preliminary civil engineering plans and layouts or reports to assist the Commission in determining the development program. Contractor should anticipate preparing a minimum of 3 options for each site; and 5.1.5 Assist with any funding/lending applications as needed. 5.2 Construction Documents / Entitlements. 5.2.1 Prepare civil plans for the Project to the Commission’s and any funder’s standards; 5.2.2 Prepare subdivision plans as required for townhouse or condominium plan;