A. Project consists of Addition to the Existing Library of Enclosed Pavilion and & Open Patio performed under direction of Construction Manager, Felker Construction (CM). Project includes 2,300 SF Steel Frame Enclosure and 5,700 SF of Patio, Retaining Walls, Glass Storefront, Metal Roof to match existing, Brick Veneer Walls & Site Grading. B. Related Documents. List of Drawings on sheet A0.1, the Project Manual inclusive of Table of Contents, and general provisions of the Contract. 1.02 EXECUTION, CORRELATION AND INTENT A. SCOPE OF WORK 1. Construction Manager will assign personnel as required to provide appropriate management and control of the Project. 2. Construction Manager is responsible for scheduling and coordinating activities as specifically indicated in Separate Contractors section below. B. SEPARATE CONTRACTORS 1. The Owner’s Separate Contractors on this project will include equipment selection, procurement, installation of the following, except as noted: a. Kitchen Equipment , Furniture b. Data & Communications Equipment & Cabling c. Audio / Visual System d. Security - Access Control, Security Cameras, Intrusion Monitoring e. Interior Graphics for Room identification and wayfinding f. Exterior Graphics, ground mounted or building mounted, 2. Construction Manager is responsible for Conduit and Boxes for the electrical systems above as indicated on the drawings. 3. Construction Manager is responsible for including all Separate Contractor Activities on the Project Schedule. C. COORDINATION BY CONTRACTOR 1. Coordination of Work. This Construction Manager shall assume full responsibility for complete coordination of the various other Contractors, in order that all Work of the respective trades, including his own, shall be done in proper sequence and at the proper time so as not to cause any delay in the progress of any trade or of the entire Project.