1. Disconnect and cap all utility lines, including electric, water and sewer. 2. The contractor is responsible for contacting Greenbrier County PSD #2 to ascertain the proper procedures for capping of sewer-line service before demolition. Failure to comply with this requirement shall render the contractor liable for any and all damages or costs incurred by Greenbrier County PSD #2. 3. Raze existing structure and remove all construction material and debris from the site. Footers are not required to be removed, however, there must be one foot of coverage over the foundation with backfill. 4. Remove all loose debris, litter, trash, refuse, etc. from lot area. 5. Dispose of all debris and material in an environmentally safe manner, including asbestos abatement. Maintain records and provide proof for disposal of material by providing weigh receipts and names of disposal sites. 6. Back fill of disturbed area as may be necessary to restore and to match the original grade. 7. Rake area smooth, seed with lawn grass and mulch with straw. 8. All work to be done under the jurisdiction of the Floodplain Officer of the Town of Rupert. 9. Understand agree to abide by the terms of this project, and to provide the requested documentation, and any breach of this agreement shall result in the bids proposed work being revoked and forfeiture of the performance bond.