The selected contractor will provide all labor, materials, equipment, and services necessary for a complete and functional restroom installation. The project includes, but is not limited to, the following: Utility Provider: Easley Combined Utilities A. General Description • Convert the existing 10’ x 10’ breakroom into a restroom and small utility/break area. • Restroom to include: o One toilet o One sink o Soap dispenser o Electric hand dryer • Finish work to include: o Durable wall and floor finishes suitable for maintenance staff use. o Adequate lighting and ventilation per code. B. Plumbing • Connect to Easley Combined Utilities water and sewer systems. • Approximate 6-inch sewer line connection located approximately 300 feet from the building (to be field-verified by contractor). • Installation of cleanouts every 75 feet along the sewer line. • Contractor is responsible for all trenching, piping, bedding, backfill, and site restoration required for the water and sewer connections. C. Electrical • Provide necessary electrical connections for lighting, ventilation fan, hand dryer, and any additional code-required outlets. • Coordinate with City staff for power source and load requirements. D. Accessibility and Code Compliance • Restroom must meet all accessibility standards and applicable local, state, and federal building codes.