The Project includes the following Work: New influent flow metering, secondary clarifier splitter box, two secondary clarifiers, UV disinfection system, post aeration, UV disinfection and effluent metal building, effluent outfall, sludge holding tanks addition, scum pump station, process return flow pump station, plant water pump station, and SCADA facilities; improvements to oxidation ditch, IFAS system modifications, WAS metering and control, RAS pumping, preliminary treatment building HVAC and mechanical system upgrades; and site and roadway improvements. A new 18-inch sewer will be installed near Pump Station No. 1 and rehabilitation including applying a corrosion protective coating will be required at Pump Station No. 1.