Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 025324 1.000 LS TRAFFIC CONTROL / 3 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 4 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 5 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 6 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / 7 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 8 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 9 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 10 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / Section 01 Total $4,372.00 Section 02 KA 7802-01 - ASPHALT SURFACING ITEMS 11 060242 16628.000 TON HMA OVERLAY (SR-12.5A) (PG 64-28) / 12 081699 16628.000 TON QUALITY CONTROL TESTING (HMA) / 13 083447 32.000 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) / 14 081773 8028.000 TON MILLING / 15 070912 414.100 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 16 070923 414.100 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II) / 17 081050 1412.000 TON PAVEMENT EDGE WEDGE (ROCK) / Section 02 Total Section 03 KA 7802-01 - RUMBLE STRIPS 18 032406 402.300 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) /